≡ Menu

links for 2007-02-03

in General
  • When you consider the traditional closed loop BPM Lifecycle, as illustrated below, the emphasis has always been very much on using analytics about how processes have performed in the past, in order that we can modify the actual process definition in order
    (tags: soa bpm bam events)
  • The Open Group Service Integration Maturity Model (OSIMM) is the industry’s first collaborative maturity model for SOA adoption. Spearheaded by members of The Open Group, including IBM, BEA, HP, EDS, and Capgemini, the initiative is working to provide a